Monday, September 18, 2006

Brewery Upgrades

(Sorry, no pics yet...)

This weekend I refurbished the kegerator and did some plumbling upgrades on the brewery. The CO2 lines were run from the back of the fridge, tank was relocated outside (the fridge) and the beer lines were replaced and rerun to make the doors close properly.

I added plumbing to the brewery to allow a hose hookup that routes to the top for filling the Hot Liquor tank and has fittings for the chiller hookups.

I also had a friend of the RCBC in town who is a mecanical engineer. I described my problem with a freebie pump being to strong, and he promptly drew up a simple diagram that limits the flow w/o deadheading (killing) the pump.


So simple, yet brilliant!